Project
Complete Bathroom Renovation with Full Tiling
A dated bathroom stripped back and rebuilt with new plumbing, fully tiled walls and floor, a new suite and a made-to-measure wooden door.
The brief
What the client wanted
The clients wanted a modern, easy-to-clean bathroom. We stripped the old room, moved pipework for a better layout, tiled floor to ceiling and fitted the new suite, finishing with a bespoke wooden door.
How we did it
Step by step, from the first day on site to the finished result.
Step 1
Tiling
Large-format wall tiles set out and fixed for clean, even joints.
Step 2
The new bathroom
The finished bathroom with new suite and tiling.
Step 3
Shower area
The shower area with screen and fittings.
Step 4
Detail
Neat tile cuts and finishes around fittings.
Step 5
Vanity and basin
Vanity unit and basin installed with tiled splashback.
Step 6
Bespoke wooden door
A made-to-measure wooden door to finish the room.
The result
A bright, modern bathroom with better layout, more storage and a finish that will last.
Planning something similar?
Call +44 20 3150 0510, email contact@adiorconstruction.co.uk or send us a message for a free visit and a fixed written quote.










