Project

Complete Bathroom Renovation with Full Tiling

A dated bathroom stripped back and rebuilt with new plumbing, fully tiled walls and floor, a new suite and a made-to-measure wooden door.

Location

Romford, London

Duration

10 days

The brief

What the client wanted

The clients wanted a modern, easy-to-clean bathroom. We stripped the old room, moved pipework for a better layout, tiled floor to ceiling and fitted the new suite, finishing with a bespoke wooden door.

How we did it

Step by step, from the first day on site to the finished result.

Step 1

Tiling

Large-format wall tiles set out and fixed for clean, even joints.

Step 2

The new bathroom

The finished bathroom with new suite and tiling.

Step 3

Shower area

The shower area with screen and fittings.

Step 4

Detail

Neat tile cuts and finishes around fittings.

Step 5

Vanity and basin

Vanity unit and basin installed with tiled splashback.

Step 6

Bespoke wooden door

A made-to-measure wooden door to finish the room.

The result

A bright, modern bathroom with better layout, more storage and a finish that will last.

Planning something similar?

Call +44 20 3150 0510, email contact@adiorconstruction.co.uk or send us a message for a free visit and a fixed written quote.